Code specifying the level of commitment to a delivery plan.
Type
String (AN)
Length
Max 3 / Min 1
Codes
<> 1
Firm
Indicates that the scheduling information is a firm commitment.
<> 2
Commitment for manufacturing and material
Authorizes the supplier to start the manufacturing of goods.
<> 3
Commitment for material
Authorizes the manufacturer to order material required for manufacturing specified goods.
<> 4
Planning/forecast
An estimate of future requirements based on trends and actual information.
<> 5
Short delivered on previous delivery
Part of a consignment which was not delivered when the original delivery was made.
<> 6
Capacity available
Capacity is available to meet the requested scheduling demands.
<> 7
Promotion
All related schedule information refer to a promotion.
<> 8
Special demand
All related schedule information refers to a special demand.
<> 9
User defined
The user can interpret the meaning of the values from information exchanged previously.
<> 10
Immediate
Indicates that the scheduling information is for immediate execution.
<> 11
Pilot/Pre-volume
Initial products required in advance of the normal production process.
<> 12
Planning
An estimate of future requirements.
<> 13
Potential order increase
The possibility and magnitude of a schedule fluctuation.
<> 14
Average plant usage
The usual amount that a manufacturing facility will use over a specified duration.
<> 15
First time reported firm
Initial confirmation of a material requirement.
<> 16
Maximum
The highest attainable amount.
<> 17
Tooling capacity
The maximum amount that the process was designed to accommodate.
<> 18
Normal tooling capacity
The anticipated amount that the process was designed to accommodate over a specific period of time.
<> 19
Prototype
The preliminary version of a product or service.
<> 20
Strike protection
Product level that is set aside as protection in the event of a work stoppage.
<> 21
Required tooling capacity
The contracted amount that the process was designed to accommodate over a specific period of time.
<> 22
Deliver to schedule
Deliver to schedule separately supplied.
<> 23
Await manual pull
Await non-EDI instruction before shipping.
<> 24
Reference to commercial agreement between partners
The buyer's commitment is the one defined in the commercial agreement.
<> 26
Proposed
Indicates that the scheduling information is a proposal.